Never really climbed with 3, so I am a bit confused with the process....(single rope).
I have a 9mm haul line (as well as my normal climbing line of course). Would I lead normally, establish my belay, then the second climbs up and cleans the pitch with the haul line tied to the haul loop and have it trailing behind her? Then assuming that throwing the dynamic line down would not reach my third (a traverse or really ledgy climb?), we could attatch the primary rope to the haul rope, and the third could pull it down using the haul line and tie in to the primary? |