Fair enough. Understand the confusion now.
As another question, are there any accepted practices for hauling multiple loads up a wall?
EG: I haul one 10kg pack, and then need to get another separate one up in a second haul.
At present I plan to join a 30m rope between packs and loop over the pulley at the top. The only hitch here is that I have to re-thread my shunt each time, which is a bit of a pain considering it's design. |