I patched the chipped footer on the slab boulder this morning.
Before
Smear the back of the hold (about 80mm across) with glue, then fill with pebbles and glue/sand mix
Pack the surface with sand/dirt mix
This 'could' wear a bit if people used it as a footer, but it's not in the right spot.
Tell us what you think after a bit of wear. |