On 26/06/2006 tnd wrote:
>It's better if the P3 leader climbs past the belay to clip that bolt,
>then downclimbs to the belay. That will prevent any chance of a Factor
>2 fall when the P4 leader sets off (assuming you are switching leads),
>and also means that the bolt can be used as part of the anchor, which is
>pretty marginal (in my opinion at any rate).
Don't let the belay put you off - it was 'beefed up' last year with the addition of a couple of pegs and is now bomber.
Climbing past it to the bolt is still a good idea though.
J |