So, swapping rope ends seems to be the concensus as opposed to re-stacking the rope?
I've heard of people using a locker on their harnesses instead of tying in directly, to speed up the changeover. This kind of gives me the willies. Am I paranoid?
On 14/04/2011 singersmith wrote:
>Agree re: simuling every inch you can.
>
As in simul-climbing? I should have been more specific in my OP. I was thinking about one climber leading everything, when climbing with 2 less experienced climbers.
Dr, you were talking about bringing both of the 2nds up to the belay at the same time, correct?
|